MIL-STD-1530C(USAF)
TABLE II. USAF ASIP Tasks and elements aligned with U.S. Department of Defense acquisition events.
MILESTONES >>> |
A |
B |
C |
|||||||
ACQUISITION PHASES >>> |
Tech Development |
System Development & Demonstration |
Production & Deployment |
Operations & Support |
||||||
REVIEWS & AUDITS >>> (per MIL-STD-1521: Cancelled; cited for reference) |
SRR System Requirements Review |
SDR [SFR] System Design Review [a.k.a. System Functional Review] |
PDR Preliminary Design Review |
CDR Critical Design Review |
TRR Test Readiness Review |
FCA [SVR] Functional Configuration Audit [a.k.a. System Verification Review] |
PRR Production Readiness Review |
PCA Physical Configuration Audit |
||
5.1.1 ASIP Master Plan |
INITIAL |
UPDATE |
UPDATE |
UPDATE |
UPDATE |
UPDATE |
UPDATE |
UPDATE |
UPDATE |
|
tion |
5.1.2 Design Service Life and Design Usage |
FINAL |
||||||||
5.1.3 Structural Design Criteria |
INITIAL |
UPDATE |
||||||||
I · Design Info |
5.1.4 Damage Tolerance & Durability Control Program |
INITIAL |
UPDATE |
UPDATE |
UPDATE |
|||||
5.1.5 Corrosion Prevention & Control Program |
INITIAL |
UPDATE |
UPDATE |
UPDATE |
||||||
5.1.6 Nondestructive Inspection Program |
INITIAL |
UPDATE |
UPDATE |
UPDATE |
||||||
5.1.7 Selection of Materials, Processes, Joining Methods, & Structural Concepts |
INITIAL |
UPDATE |
||||||||
II · Design Analyses & Development Testing |
5.2.1 Material & Joint Allowables |
INITIAL |
UPDATE |
UPDATE |
||||||
5.2.2 Loads Analysis |
INITIAL |
UPDATE |
UPDATE |
|||||||
5.2.3 Design Service Loads Spectra |
INITIAL |
UPDATE |
UPDATE |
|||||||
5.2.4 Design Chemical/Thermal Environment Spectra |
INITIAL |
UPDATE |
UPDATE |
|||||||
5.2.5 Stress Analysis |
INITIAL |
UPDATE |
UPDATE |
|||||||
5.2.6 Damage Tolerance Analysis |
INITIAL |
UPDATE |
||||||||
5.2.7 Durability Analysis |
INITIAL |
UPDATE |
||||||||
5.2.8 Corrosion Assessment |
INITIAL |
|||||||||
5.2.9 Sonic Fatigue Analysis |
INITIAL |
|||||||||
5.2.10 Vibration Analysis |
INITIAL |
|||||||||
5.2.11 Aeroelastic & Aeroservolelastic Analysis |
INITIAL |
UPDATE |
||||||||
5.2.12 Mass Properties Analysis |
INITIAL |
UPDATE |
UPDATE |
|||||||
5.2.13 Survivability Analysis |
INITIAL |
|||||||||
5.2.14 Design Development Tests |
INITIAL |
UPDATE |
UPDATE |
|||||||
5.2.15 Production NDI Capability Assessment |
FINAL |
|||||||||
5.2.16 Initial Risk Analysis |
INITIAL |
10