TASK III
TASK IV (FORCE MANAGEMENT DATA PACKAGE)
Interpretation and Evaluation of
Test Results
Critical Parts List
Force Structural Maintenance Documentation (Design Usage)
Individual Aircraft Tracking Program
Data
Data
Inspection and Modification
Requirements
When ? - Where ? How ? - Costs ? Economic Life Estimates
Design or Baseline Operational Usage
Data
Updated Force Structural Maintenance Documentation
Baseline Operational Usage
Development of Baseline Operational Spectra
Aircraft
Acquisition
Equipment
Acquisition
Procedures
Analysis
Methods
Data
Analysis
Modifications and Changes
Loads/Environment Spectra Survey
Aircraft Fleet Operations
Aircraft Manufacture, Inspection
Production Aircraft Manufacturing
Verification Tests Damage Tolerance and Durability Control
C Milestone
PCA
Production and Deployment Phase
FIGURE 3. Aircraft Structural Integrity Program - Part 3.
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business